Built by McNeil Group in Lucas this 926m2 office space comprises of two stories including an undercover secured garage area.
Tuddy’s Engineering were contracted by Macneil Group to supply and install the structural steel for this office development.
Tuddy’s Engineering expert workshop staff fabricated the steel in our Delacombe workshop before the steel was installed in Lucas by our experienced onsite teams.